Ready to Fly

Every Gateway 2 check, tracked and signed off.

A single system that tracks every Gateway 2 check against the regulation — not a spreadsheet, not a form.

22–43 weeks — actual Gateway 2 turnaround

Against a statutory target of 12 weeks. Real-world delays are reported at 9–12 months. Ready to Fly is built to close that gap, not paper over it.

What it is

71 deterministic agents. Every required check. One signed-off answer.

Every Gateway 2 requirement is specified as its own deterministic agent, mapped directly against current Building Safety regulations. Each agent guides the required checks, captures the answers and supporting evidence, and identifies anything requiring resolution. Agents can operate in parallel or through defined dependencies, building into a single, traceable, signed-off Gateway 2 record.

Why now

Every Higher-Risk Building now answers to Gateway 2. Get it right, first time.

The Building Safety Regulator has been fully in force since April 2024. Every Higher-Risk Building — 18 metres or seven storeys and up, or a hospital, or a care home — has to clear Gateway 2 before work can proceed. There's no version of this that gets easier by waiting.

Execution

Right first time

Faster, more consistent Gateway 2 preparation and assurance — fewer resubmissions, earlier sight of missing information.

Evidence

The golden thread, operational

A single source of truth for what was built and how — continuous execution evidence, not just documentation assembled after the fact.

Lifecycle

Beyond approval

Every asset in a building carries a BIM code — Ready to Fly's evidence carries forward into facilities management, not just the gateway.

Get in touch

See Ready to Fly on a live Gateway 2 submission.

We're working directly with building safety teams and main contractors on active Higher-Risk Building projects — the best way to understand Ready to Fly is to see it against real work.